PropTech & Industrial Systems Integrator

Silicon Valley Engineering Rigor.
Bihar's Industrial Future.

High-precision Pre-Engineered Buildings (PEB) and CNC-driven turnkey modular interior manufacturing from our planned 10,000 sq. ft. industrial facility at Plot I.P.-10, BIADA Motipur Cluster — targeted commissioning 2027, planned launch of operations 15 April 2027.

Planned launch of operations
–days
–hours
–minutes
–seconds
15 April 2027 · targeted
₹1.50 Cr
Phase-I project outlay (proposed)
10,000
Sq. ft planned industrial footprint
50+
Direct technical roles at launch
4.32x
Peak projected DSCR (as per Phase-I DPR)
What we plan to build

From design to delivery, one engineering backbone

Our planned production at Motipur covers both the structural shell and the interior fit-out — backed by the architectural and design services our studio delivers today — so a building project moves from one 3D model to one delivery team.

Architectural render of a planned PEB building Steel structure design review on a laptop

Pre-Engineered Buildings

Industrial sheds, school auditoriums and modular hospital wards — designed in 3D BIM and planned for CNC fabrication on our proposed first line.

CNC machine cutting wood panels Technician at a woodworking bench

Modular Interiors

Smart classroom dual-desks, laboratory systems and hospital furniture, engineered for repeatable CNC quality on the planned second line.

Engineer working on a structural drawing Team reviewing a technical plan

Architectural & design services

3D BIM modelling, interior design and space planning, structural (Tekla) detailing and design-and-build consultation — delivered today by JFI Studio, scaled for Bihar.

Large industrial interior Factory floor with industrial machinery

Turnkey delivery

One team carries the building from BIM model through production and quality control to site deployment — the same method our founders run today at JFI Studio.

Reverse Migration Talent Portal

Come home to build Bihar

Every year, lakhs of skilled Biharis — welders, machine operators, carpenters, fabricators — leave home to find work in other states. Their skills build other cities. Their families wait in Bihar.

Our reverse-migration initiative keeps a single registration desk for the whole company — one place where Biharis working outside the state can record what they are good at, and be first in line for roles at our proposed Motipur plant as it commissions — and for the wider manufacturing ecosystem growing across Bihar.

● Registration is live now

165 workers across 19 districts have already registered (September 2026) — and registrations are growing every week.

Registration desk

All registrations — skilled, semi-skilled and unskilled — happen in one place, so your details live in a single system only. 165 workers across 19 districts have already registered (September 2026).

How to register — see Careers →

You get a verified digital JFBPL Mission ID, district-wise mapping and first-in-line status as roles open.

How it works

Three steps to come home

1
Register

Registration is live now — add your skills and current city; it takes minutes.

2
We map

Registrations are matched against the planned roles — with at least 25% of hiring reserved for skilled and semi-skilled workers ready to return home.

3
You get called first

As commissioning approaches (targeted 2027), registered candidates are contacted before openings go public.

About JFBPL

Engineering Bihar's industrial renaissance

Jainath Fabrik BR Pvt Ltd (JFBPL) is a ConTech and PropTech systems integrator — bridging computational design, heavy industrial fabrication and turnkey interior manufacturing. With innovation and strategic oversight anchored in Bengaluru and regional manufacturing rooted in the BIADA Motipur cluster, JFBPL eliminates infrastructure leakages, freight inflation and out-of-state vendor dependencies through localised, automated production.

Eastern India's buildings have long run on fragmented execution: heavy structural work is severed from interior finishing, and materials cross multiple state borders with markups and delays at every step. JFBPL was established to close that gap with one unified systems-integrator model — and a circular-supply roadmap to help the state's industrial authorities operationalise underutilised sheds and machinery, keeping capital circulating within Bihar.

Silicon Valley Engineering Rigor. Bihar's Industrial Future.

Credentials

  • Registered nameJainath Fabrik BR Pvt Ltd
  • CINU74102BR2026PTC086154
  • Registered officeParsa Pakridayal, East Champaran, Bihar
  • Plant (proposed)Plot I.P.-10, IA Damodarpur, Motipur, BIADA, Muzaffarpur
  • NIC 25119Metal structural products (heavy PEB)
  • NIC 16222Builder's joinery & carpentry
  • NIC 31003 / 31009Institutional & modular furniture
  • AccreditationsGeM · MSME/Udyam · DPIIT startup — recognition applied

See where the project stands →

Governance

Zero-leakage governance, by design

People: no ghost labour

Biometric attendance at every gate and workstation, digitised muster rolls and wages credited directly to bank accounts — every paid name is a verified person on site.

Material: no diversion

IoT weighbridge logging, daily inward-outward reconciliation and QR-traceability from raw steel plate to finished component — every movement can be audited piece by piece.

Money: auditable flows

Digital purchase and payment records against every work order, with fund-utilisation statements stakeholders can verify line by line.

Oversight: open to audit

Read-only dashboards and log exports for institutional buyers and auditors — access designed in from day one, not retrofitted after an incident.

All of the above is specified as planned systems in the Phase-I DPR — the plant is designed so compliance is the default, not an afterthought.

The dual-node network

Bengaluru innovation. Bihar manufacturing.

Bengaluru — innovation node

The JFI Studio design-and-execution floor in Bengaluru

JFI Studio (Jainath Fabrik Interiors), Yeshwantpur, Bengaluru — the founders' architect-led turnkey interior studio (jfistudio.in): in-house design and execution for homes and commercial spaces, with in-house civil, carpentry, electrical and painting teams, transparent fixed pricing and 45-day handovers — the digital proving ground, revenue engine and hiring pipeline for the Motipur plant.

Bihar — manufacturing node

Proposed 10,000 sq.ft dual-line plant at the Motipur cluster — 4,500 sq.ft covered heavy shed and 5,500 sq.ft logistics yard per the DPR, planned around 100-ton hydraulic press brakes, heavy CNC plasma cutters, automated edge-banders and high-capacity boring lines. From 50+ direct technical jobs and 100+ ecosystem livelihoods at launch to 5,000 direct jobs targeted in three years.

Business model

How we sell

Government programmes

Public building programmes delivered through open procurement — target segments: BSEIDC schools, BMSICL healthcare and BUIDCo urban works.

B2B — Contractors & institutions

Structural packages and interior fit-outs for EPC contractors, industrial units and private institutions building in Bihar.

B2C — Homes & offices

Modular interiors delivered direct to homes, offices and small institutions through our studio's design-and-execution service.

Silicon Valley Engineering Rigor. Bihar's Industrial Future.

Our mission — build Bihar's buildings in Bihar — is a statement of intent, not a claim of current capability. Every milestone on this site is dated, labelled and updated the day it truly lands.

Pre-Engineered Buildings, engineered for Bihar

Structures designed in 3D BIM and planned for CNC fabrication at our proposed Motipur plant — with targeted production from 2027.

PEB Structures

The product range

Our planned production line includes the complete structural scope of institutional and industrial buildings — from the primary frame to cladding, all detailed in a coordinated BIM model before a single cut is made.

Industrial workshop with structural beamsClean industrial factory floor

Industrial sheds

Single- and multi-bay production sheds with clear spans detailed for equipment layouts.

Large warehouse interior in perspectiveIndustrial storage with heavy shelving

Warehouses & logistics structures

Column-efficient storage buildings engineered for racking and movement zones.

Auditorium with tiered seating and podiumLecture hall with tiered blue seating

School auditoriums & classrooms

Long-span community and academic spaces designed with institutional budgets in mind.

Hospital ward corridor with medical equipmentModular medical room with hospital beds

Modular hospital wards

Rapidly deployable ward blocks planned for healthcare programme timelines.

Large institutional hall with tiered seatingCommunity hall with red tiered seating

Community & institutional halls

Anganwadi centres, panchayat halls and training centres on repeatable frames.

Industrial mezzanine with steel spiral staircaseIndustrial interior with mezzanine level

Factory extensions & mezzanines

Extensions detailed to tie into existing structures from the same BIM model.

Who we are building for

Target segments

Where the planned PEB line is aimed. We are not yet engaged on these programmes — these are the segments the project is designed to serve.

EPC contractors

Structural packages for contractors delivering building projects in Bihar.

BSEIDC school programmes

Target segment: classroom blocks and auditorium structures for school infrastructure.

BMSICL healthcare projects

Target segment: ward blocks and modular hospital structures.

BUIDCo urban works

Target segment: municipal kiosks, urban market shelters and civic fit-outs.

Phase 2 — planned expansion

Roads, bridges & highway infrastructure

Where the PEB line is designed to expand after the launch of operations — the same steel engineering backbone, applied to the state's highway programme.

Toll plazas & wayside amenities

Standardised toll-booth structures and highway amenity buildings, repeatable across corridors.

Bus terminals & shelters

Terminal roofs, platform shelters and transit furniture engineered in BIM for quick deployment.

Bridge & foot-over-bridge works

Steel girder and foot-over-bridge structures, CNC-fabricated to documented tolerances for site assembly.

Highway safety & signage gantries

Crash barriers, signage gantries and lighting structures — standardised, hot-dip galvanised, corridor-wide.

Modular interiors with repeatable CNC quality

Furniture and interior systems designed for CNC production at our proposed Motipur plant — engineered for schools, hospitals and institutions.

Modular Interiors

The product range

Our planned production line includes furniture and interior systems built for repeated orders: the same model, the same machine program, the same verified output — every unit, every time.

Smart classroom with students and projector screenModern classroom with desks and monitors

Smart classroom dual-desks

CNC-cut desk systems designed for digital classrooms and rough daily use.

Technical lab interior with specialised equipment

Laboratory systems

Workstations and storage for physics, chemistry and biology labs.

Hospital ward with medical bedsMedical consultation room

Hospital furniture

Bedside lockers, overbed tables and ward furniture engineered for hygiene.

Row of modular office workstationsOpen-plan office with glass partitions

Office modular workstations

Desk and storage systems that scale from one classroom to a full campus.

Bedroom with integrated wardrobe and study unit

Hostel furniture

Beds, study tables and wardrobes built for high-occupancy durability.

Library with floor-to-ceiling bookshelvesArchive library with tall shelving

Library & storage systems

Shelving and reading-room furniture on standard CNC programs.

Specifications

Both production lines, side by side

Planned line configurations for the proposed Motipur plant; the full equipment schedule is maintained in the detailed project report.

Line 1 — Heavy PEB structures

  • Design method3D BIM (coordinated model)
  • Structural detailingAnchor-ready, shop drawings from the model
  • Cutting (planned)Heavy CNC plasma cutting — 1.5 m × 3 m bed
  • Forming (planned)100-ton hydraulic press brake
  • Handling (planned)3–5 T overhead EOT crane gantry
  • Welding (planned)MIG / ARC / TIG multi-process stations
  • Finishing (planned)Surface prep and protective coating
  • Quality controlDocumented stage-wise checks
  • DeliveryTurnkey erection and handover

Line 2 — Modular interiors

  • Automated setup (planned)₹38.53 lakh woodworking line, per the DPR
  • Design method3D BIM (coordinated model)
  • Product engineeringFlat-pack ready, CNC cut lists from the model
  • Cutting (planned)Precision sliding panel saws
  • Edge & bore (planned)Automatic high-speed edge-banding line; multi-spindle boring
  • Pressing (planned)Hydraulic cold press
  • Dust control (planned)Centralised industrial dust extraction
  • Quality controlDocumented checks per batch
  • DeliveryTurnkey installation and handover
How we build

One engineering backbone: from BIM to site

The same model that is designed is the model that is manufactured, checked and erected. No translation losses between stages.

The method in detail

Six steps, one accountable team

1
BIM design

Every project begins as a coordinated 3D model — structure, interiors and services designed together.

2
Digital engineering

Shop drawings and CNC cut lists are generated directly from the model, not redrawn by hand.

3
Material planning

Quantities come from the model, so procurement is ordered against verified numbers.

4
Dual CNC production

Planned cutting and forming on two lines at Motipur: one for structures, one for interiors.

5
Quality control

Documented checks at each stage before anything ships — records kept audit-ready.

6
Turnkey deployment

One team erects, installs and hands over — the method our founders run today at JFI Studio.

Phase 2 — in design for the commissioned plant

Planned digital systems

These systems are in design for the plant targeted for commissioning in February–March 2027. Nothing here is live today — this is roadmap framing only.

Planned IoT & production tracking

Machine-level monitoring of the planned CNC lines: uptime, throughput and traceability of every component back to its BIM element.

Planned digital workforce systems

Training records, skill matrices and quality accountability designed around the 50 targeted roles.

Projects and proof

The founders' studio portfolio and the Motipur milestones

Selected projects delivered by JFI Studio, the founders' running design-and-execution studio in Bengaluru — the same BIM-first method the Motipur plant is built to scale. Client names withheld; representative imagery from delivered work.

Office fit-out with desks and meeting areaOffice reception and workspace

Corporate office fit-out

Bengaluru · 2023

Row of office workstationsOpen-plan office lounge

Commercial fit-out & workspaces

Bengaluru · 2023

Bedroom with integrated wardrobeBedroom with wooden panelling

Residential interiors & wardrobes

Bengaluru · 2024

Office with mezzanine level and stairsOffice with glass-walled meeting room

Turnkey office interiors

Bengaluru · 2024

Office corridor with workstationsWorkspace with wooden ceiling slats

BIM-design & execution project

Bengaluru · 2024

Classroom hall with desk rowsInstitutional classroom space

Institutional interior package

Bengaluru · 2025

Dining and living area with pendant lightsOpen-concept living and dining area

Residential turnkey interiors

Bengaluru · 2025

Luxury living room with high ceilingsLuxury living room with large window

Design & build commission

Bengaluru · 2025

Milestones

The Motipur project, as it truly stands

Updated the day each step happens — this page is our credibility clock.

Done

Company incorporated Done

Jainath Fabrik BR Pvt Ltd registered, with company identification number.

Done

Detailed project report & financing plan Done

Phase-I DPR prepared — cost, means of finance and five-year projections.

Current stage

Site identified — allotment application filed Decision awaited

Application filed with BIADA for Plot I.P.-10, IA Damodarpur, Motipur (proposed 10,000 sq.ft). Decision awaited.

Targeted Q4 2026

Land handover Target

Site possession, fencing and civil works mobilisation.

2027

Machinery & civil works Target

Planned CNC line installation and building works in parallel.

Targeted Feb–Mar 2027

Commissioning Target

Targeted start of production on both lines — the first roles of the 5,000-job plan.

Planned 15 April 2027

Launch of operations Plan

Commercial operations begin. The live countdown on our Home page runs to this date.

Leadership

Originally from Bihar. Returning from India's Silicon Valley.

Three founders — engineers and architects by training, Biharis by origin — coming home to build the state's industrial future.

The founders

Three directors, one studio, one factory

All three directors also own and run JFI Studio, the design-and-execution studio in Bengaluru — the working method before the Motipur plant.

Suraj Kumar Thakur
Founder & Chairman

8+ years in IT with global technology and OEM majors in Bengaluru. Leads capital strategy, the awaited BIADA allotment and government relations. Co-owner, JFI Studio.

Ansh Kumar
Co-Founder & Managing Director

Graduate interior designer with years of end-to-end delivery experience in Bengaluru. Whole-time oversight of plant operations, supply chain and workforce onboarding. Co-owner, JFI Studio.

Ritesh Kumar
Co-Founder — Executive Director (Architecture & Technology)

Graduate architect and Chief Architect. Heads BIM spatial design, Tekla detailing, CNC/CAM pipelines and site quality control. Co-owner, JFI Studio.

Careers

Coming home to build Bihar

5,000 direct jobs targeted over the next three years — across skilled, semi-skilled and unskilled categories. First roles open at commissioning 2027; planned launch of operations: 15 April 2027. Registration for future roles is live on the Atmanirbhar Bihar portal.

Planned launch of operations
–days
–hours
–minutes
–seconds
15 April 2027 · targeted
Register

All registrations happen on the Atmanirbhar Bihar portal

Bihar Hai Taiyaar — बिहार है तैयार

Expression of interest for future roles — not a current vacancy. We are not hiring today; when roles open, registered candidates are contacted first.

● Registration is live now

Skilled, semi-skilled and unskilled workers from across the state are already registering to be part of Bihar's industrial growth — 165 workers across 19 districts as of September 2026 — and the JFBPL family. Register on the portal and you are first in line as roles open at Motipur.

Register on atmanirbharbihar.in

Questions in the meantime? Write to .

Planned roles

The 5,000 direct jobs we are targeting

A three-year employment generation plan across every function the plant and the company need — from the factory floor to the boardroom — beginning with the first roles at commissioning. These are planned roles, not current vacancies; the roster is finalised with hiring as operations scale.

Hiring priority (planned). First offers go to candidates from East Champaran and the plant's neighbouring districts. At least 25% of all planned roles are reserved for skilled and semi-skilled workers from Bihar currently working outside the state who are ready to return home — see registration below.

Engineering & design

  • Civil engineers
  • Structural (Tekla) detailers
  • BIM modellers
  • Interior & product designers
  • Design engineers

Plant & production

  • CNC machine operators & programmers
  • Certified MIG/TIG welders
  • Edge-banding & finishing operators
  • Furniture assembly-line operators
  • Quality-control inspectors
  • Plant maintenance technicians

Supervision & management

  • Production supervisors
  • Floor managers
  • Shift & dispatch in-charges
  • Safety officer

Corporate & support

  • Human resources (HR)
  • Finance & accounts
  • Marketing
  • Sales & business development
  • Front office & administration

Logistics, drivers & site

  • Drivers (commercial licence)
  • Stores & procurement assistants
  • Erection & installation teams
  • Packing & loading

Entry-level

  • Production helpers
  • Machine helpers
  • Plant housekeeping & upkeep
  • General support during civil works
Employment benefits (planned)

Formal jobs, with formal protections

Every role is planned as an on-roll company position — not cash-in-hand daily work. Statutory benefits apply as per law at hiring.

EPF

Provident Fund — retirement savings deducted and matched by the company, as applicable.

ESI

Employees' State Insurance — subsidised medical care for employees and families, as applicable.

Insurance

Group accident and health cover planned for plant and site-deployment roles.

Leave & gratuity

Paid leave, statutory bonus and gratuity as applicable — plus on-the-job training.

Training & placements

Skills in, careers out

Planned programmes alongside hiring — details finalised as the plant approaches launch.

Trainees working on industrial machinery in a workshop Workers handling steel materials in an industrial facility Industrial production line with conveyor machinery

Skill-based training for ITI & Diploma pass-outs

Structured, shop-floor training aligned to our production roles — CNC operation, welding, fitting and electrical maintenance — designed around ITI and polytechnic curricula, with placement into the plant on successful completion. Planned in coordination with local ITIs and polytechnics; formal tie-ups will be announced here as they are signed.

Industrial internships for graduates

Internships in BIM modelling, production planning and quality control for engineering, architecture and design graduates — with a placement opportunity at the plant based on performance.

For investors

Invest in Bihar's building blocks

A proposed ₹1.50 crore phase-I dual-line manufacturing project: projections, assumptions and the full DPR on request. Peak projected DSCR: 4.32x — CA-certified projection as per the Phase-I DPR.

What we seek

Four kinds of partners and support

Seed or angel co-investment

Equity co-investment in the phase-I project alongside the founders.

Strategic partnerships

EPC contractors, dealers and institutions aligned with the planned product lines.

Bank debt facilitation

Introduction to lenders for the term-loan component of the means of finance.

Guidance & Government of Bihar support

Facilitation and guidance from the Government of Bihar's industrial ecosystem — from the awaited BIADA allotment decision through licensing, incentives and operations — as the project moves from plan to plant.

For serious investors

Request the detailed project report

The Phase-I DPR is prepared by a practising Chartered Accountant and its financial projections are CA-certified. Requests reach the Managing Director directly at .

Statutory vault

  • EntityJainath Fabrik BR Pvt Ltd
  • CINU74102BR2026PTC086154
  • NIC 25119Fabrication of structural metal products (PEB)
  • NIC 16222Manufacture of builder's joinery & carpentry
  • NIC 31003Manufacture of wooden furniture — offices, hospitals, education
  • NIC 31009Manufacture of other furniture & modular fit-outs

Investor documents

Available by request from the MD's desk — sent to your inbox:

Request the CA-Certified Projected Phase-I DPR by email Request the BIADA Executive Profile by email

No downloads on the site — documents are issued directly by the MD's desk to verified email addresses.

Contact

Talk to the people building it

One team, straight to a founder.

Registered office

Parsa Pakridayal, East Champaran,
Bihar 845428

CIN: U74102BR2026PTC086154

Bengaluru — design studio

JFI Studio (Jainath Fabrik Interiors)
3/111, 8th Main, Mohan Kumar Nagar, Yeshwantpur, Bengaluru, KA 560022 — visits by appointment

Managing Director

Ansh Kumar, Co-Founder & Managing Director

Careers & registration

Job, training and portal-registration questions.

General enquiries

For everything else — products, quotes, partnerships — write to the company inbox.